![]() |
Unit No. 1403, 14th Floor, Negin Reza tower, Ashrafi Esfahani Expy, Tehran, Iran. +98 21 4403 1818 +98 21 4406 3628 This email address is being protected from spambots. You need JavaScript enabled to view it. |
Based on our goals in these 10 years, the quality of the projects are so important for us so that it could been endorsed scientifically, operationally. SKZhas always relied on its experts’ scientific support and belief in work ethics, to provide the best possible quality.
One of the most prominent parts of mineral exploration is exploratory drilling. SKZ has a high expertise in network design for metallic and non-metallic deposits and drilling operations.
Consultation services in preparation of exploration in various stages of exploration from reconnaissance to general,and also detailed exploration, cooperation with companies and investors, consulting and technical reports from primaryexploration to production steps (exploration, development and mining equipment plans, machinery and mining projects) are the services of SKZ.
SKZ is ready for consulting in regional exploration and exploitation plans, implementation of them, introducing technical managers, and so on. Furthermore, our company is interested in contracts with all real and legal within and outside Iran in these fields.
Long Year 38 (LY38 Drill Rig Specifications) |
||||||
Deutz BF4L 913 Air Cooled Turbo |
ENGINE |
|||||
2500 RPM |
INTERMITTENT RATING |
|||||
HP |
KW |
|||||
97.9 |
72.0 |
|||||
2500 RPM |
CONTINUOUS RATING |
|||||
HP |
KW |
|||||
89.8 |
66.0 |
|||||
5 Speed Isuzu BG 5A |
GEAR BOX |
|||||
6.378 |
1st Gear |
|||||
3.627 |
2nd Gear |
|||||
2.239 |
3rd Gear |
|||||
1.452 |
4th Gear |
|||||
1.000 |
5th Gear |
|||||
Reverse Gear: 5.835 |
||||||
14” Clutch Assembly Manual Clutch Lever Set Up |
CLUTCH |
|||||
Lovejoy Flexi Coupling |
TRANSMISSION TO CHEST |
|||||
Electrical Start Panel with Warning Lights – Low Oil Pressure & High Temperature Gauges |
ELECTRICIAL |
|||||
Standard Longyear HQ Series Drill Head with Hydro Static Chuck 800mm Stroke |
DRILL HEAD |
|||||
Full set of BQ Jaws Tungsten Inserts Full set of NQ Jaws Tungsten Inserts Full set of HQ Jaws Tungsten Inserts |
CHUCK JAWS |
|||||
Full set of Foot Clamp Jaws BQ Tungsten Inserts NQ Tungsten Inserts HQ Tungsten Inserts PQ/HWC/HWT Tungsten Inserts |
FOOT CLAMP JAWS |
|||||
HQ=300 |
DRILLING DEPTHS BASED ON CLEAN HOLE (m) |
|||||
NQ=500 |
||||||
BQ=700 |
||||||
|
HYDRAULIC SYSTEM |
|||||
Eaton 70423-LBC 2.77 CCW1 Mounted off Front of Deutz Linked with Dyna Gear Coupling |
MAIN PUMP |
|||||
VG20 Commercial 6 Lever Valve Bank OP 10 Valve Hi and Low Pressure OP 20 Valve Mud Mixer Control |
MAIN VALVE BANK |
|||||
OMT 400 |
WIRELINE MOTOR |
|||||
Oil Path Valve |
WIRELINE MOTION |
|||||
Radial Made |
SINGLE STAGE MAST |
|||||
Single Stroke |
LIFT CYLINDER |
|||||
Radial Made with 1000Mtr & 6mm Wire |
WIRELINE SPOOL |
|||||
Hydraulic Rod Slide on Mast with Check Valve |
ROD SLIDE |
|||||
Hydraulic Head Opener |
HEAD OPENER |
|||||
Radial Made Mixer Hydraulic Operated by Supply Pump |
MUD MIXER |
|||||
Hydraulic Operated from Main Valve Bank Radial Made Foot Clamps |
FOOT CLAMP |
|||||
400Ltr Capicity |
HYDRAULIC TANK |
|||||
F2L511 Air Cooled Deutz 1500 RPM |
ENGINE |
|||||
HP |
KW |
|||||
16.6 |
12.2 |
|||||
Newage 4 Speed Gearbox |
GEAR BOX |
|||||
7.70:1 |
1stGear |
|||||
5.32:1 |
2ndGear |
|||||
3.31:1 |
3rdGear |
|||||
1.79:1 |
4thGear |
|||||
1.79:1 |
Reduction Box |
|||||
WII22 535 John Bean Mud Pump 1000 PSI Max Pressure with Relief Valve Fitted 2” Inlet |
MUD PUMP |